“Grand Junction is one of most brutal environments in which to do shows. The temperature and humidity vary in the extreme. Temperatures here exceed 100 degrees, and we've had 60mph winds. This year, the sound was dramatically more consistent because the coverage of our new VERTEC system is so smooth and predictable.”
- Jay Waller, Owner, Stage Pro (Country Jam 2004 - Grand Junction, Colorado) June 23-27

(from left: Jeff Han , System Tech. Paul Sancken, Monitor Engineer. Jay Waller, Owner. Nick Mourn, Crew Chief, System Engineer. Tim Smith , FOH Technician).


Copyright © 2004 JBLPro. 
All rights reserved. Revised: 5/9/01